ATS welcomes you to Casa Espana- a Spanish inspired Hacienda designed as an elite private estate for the crème de la crème. Built with the renowned standards of excellence that have turned ATS Group’s projects in Gurgaon, Noida, Greater Noida and Dera Bassi into famed landmarks, ATS Casa Espana presents a rare opportunity to own an iconic home that is set to rise as Mohali’s beacon of luxury and sophistication. Designed by acclaimed architect Hafeez Contractor. 

Exceptional care has been taken to create homes that are highly distinctive and elegant. With layout that feature only two homes on every floor, ATS Casa Espana provides for unparalleled living in privacy and repose. Dramatic architectural elements define the ATS Casa Espana homes- sunbathed living rooms with spectacular outdoor views, spacious bedrooms with private balconies and interiors finished in immaculate detail. ATS Casa Espana infuses Spain’s classic design to create gorgeous homes in timeless elegance. 
ATS-CASA ESPANA
Sec-121 Mohali
100% DOWN PAYMENT
Type A (4BHK+S.R) Type B (3BHK+S.R)
Area (Sq Ft) 3300 2400
BSP @ Rs.4000/- per sq ft 13200000 9600000
Maintenance Deposit 50000 50000
Power backup 5 K.V.A 100000 100000
Value of One Parking 200000 200000
Total 13550000 9950000
Payment Timeline
At time of booking 2640000 1920000
With in 45-60 days+ other charges 10560000 7680000
At possession+other charges 350000 350000
Total 13550000 9950000
INSTALLMENTS- Construction Linked Plan
Apartment Type Type A (4BHK+S.R) Type B (3BHK+S.R)
Area (Sqr Ft) 3300 2400
BSP @ Rs.4500/- per sq ft 14850000 10800000
Maintenance Deposit 50000 50000
Power backup 5 K.V.A 100000 100000
Value of One Parking 200000 200000
Total 15200000 11150000
INSTALLMENT PLAN FOR ATS CASA ESPANA
Payment Timeline Type A- Amt.(In Rs.) Type B- Amt. (In Rs.)
On Booking 10% 1485000 1080000
Within 30 day of Booking 20% 2970000 2160000
On Completion of Basement 10% 1485000 1080000
Installment on laying of GF roof Slab 5% 742500 540000
Installment on laying of 3rd roof Slab 5% 742500 540000
Installment on laying of 6th roof Slab 5% 742500 540000
Installment on laying of 9th roof Slab 5% 742500 540000
Installment on laying of 12th roof Slab 5% 742500 540000
Installment on laying of 15th roof Slab 5% 742500 540000
Installment on laying of 18th roof Slab 5% 742500 540000
Installment on laying of 21th roof Slab 5% 742500 540000
Installment on laying of 24th roof Slab 5% 742500 540000
On Completion of Internal Flooring 5% 742500 540000
On completion of Tower Services 5% 742500 540000
On intimation for possession( BSP+ Other Charges) 5% 1092500 890000
Total Basic Selling Price 15200000 11150000
Note:
1. Registry is done on possession, as per the rate prevailing at the time of registry as per the circle rates or agreement value which ever is higher.
2. Parking , Maintenance & power back up  is payable on posession.
3.Service Tax will be charged on BSP(inclusive of parking) @4.2%(type A) / 3.5%(type B) & on Power back up & Maintenance @ 14%
4. Price Revision is subject to sole discrection of the company.
5. Additional charges as levied by various authorities shall be charged extra and payable on demand.
6.EDC/IDC as Applicable.
7. Service tax has to be borne by the customer(even in bank loan cases).
8. TDS 1% included in price.

 

 location-map

Specification Sheet